Central Tri-State Tollway (I-294)

Central Tri-State Tollway (I-294) Project

Project Overview

The Central Tri-State Tollway (I-294) is being reconstructed and widened from Balmoral Avenue to 95th Street to provide congestion relief, reconstruct old infrastructure to meet current and future transportation demand and address regional needs. The project is scheduled from 2018 through 2026. This 22-mile corridor serves more than 300,000 vehicles daily. The $4 billion project is scheduled from 2018 through 2026.

The Illinois Tollway has undertaken a detailed planning and refinement process to develop design and construction plans for the Central Tri-State Tollway Project. Major components of the project include reconfiguring the I-290/I-88 Interchange at I-294, rebuilding the Mile Long Bridge and the BNSF Railway Bridge, as well as integrating Flex Lanes and SmartRoad technology.

Read More

 

2024 Overview

Construction in 2024 will continue mainline reconstruction and widening between Wolf Road and I-55, and the new roadway between I-55 and 95th Street is scheduled for completion. 

Ongoing work this year also includes reconfiguration of the I-290/I-88 Interchange at I-294. and construction of the new interchange at 88th/Cork Avenue is continuing. In addition, ramp improvements at the Ogden Avenue Interchange are scheduled to be complete.

View Construction Cameras

View Construction Photos

 
Central Tri-State Tollway

Visualization of Corridor Improvements

 

Overview Map
View full-size map

CONCEPT PLAN
MAP

Central Tri-State Concept Map
View full-size map

PROJECT SCHEDULE
MAP

Central Tri-State Schedule Map

EB ARCHER AVENUE TO SB I-294 RAMP CLOSURE DETOUR

EB Archer Avenue to SB I-294 Ramp Closure Detour Map
View full-size map

Hinsdale Area Update (08/21/2024)

As part of the Illinois Tollway’s reconstruction and widening of the Central Tri-State Tollway (I-294) construction activity may have an impact on residential areas adjacent to the Tollway. Work will be performed throughout the day, with overnight and weekend work scheduled as needed. Check here for updates.
 
Current and upcoming construction will include the following:

  • Earth excavation and installation of Harding Road underground stormwater detention is ongoing. Heavy equipment will be working on site and residents may notice some increased noise and construction may occur on weekends.

  • Installation of the permanent access control fence around the Peirce Park box culvert is underway. Contractors will access the site from Mills Street. Work is being coordinated with the Village of Hinsdale and Hinsdale Little League.

  • Relocation of the 55th Street watermain is ongoing. Local road closures have been lifted and restoration of the 900 block of Harding Road is complete.

  • Roadway construction activity on the I-294 mainline in August will include concrete pavement breaking and removal, saw cutting and milling, earth excavation and grading, storm sewer and drainage installations, noisewall post/panel installation (Harding Road to 55th Street), retaining wall construction, Flagg Creek bridge work and pile driving, overhead sign structure installation, ITS work, box culvert installation north of BNSF, permanent lighting installation, during daytime hours. Residents may notice some increased noise and construction may occur on weekends.

  • Construction at the Ogden Avenue Interchange is ongoing with retaining wall installation, noisewall removal and temporary pavement. The reconstructed northbound I-294 to eastbound Ogden Avenue ramp is open. 

  • Storm sewer construction is ongoing at the Mills Street cul-de-sacs between The Lane and Fuller Road. This work requires partial roadway closures and will temporarily limit the turning radius on the cul-de-sacs in the 500 and 600 blocks of Mills Street. Access to homes and driveways will remain open during construction. In addition, while work is occurring the existing wooden fence has been replaced with a temporary chain-link fence with site screen. The wooden fence will be reinstalled after construction of the storm sewer has been completed. Local access will be required for fence removal and installation and pavement restoration. Storm sewer work will occur from the Tollway side, and contractors will not be allowed to park on local streets during the construction.

The Tollway has coordinated with the Village of Hinsdale throughout the design, planning and construction of this project to reduce the inconvenience this construction project has on local residents and businesses near the Tollway.

Contact our construction communications team via email at 294tristate@getipass.com or our 24/7 construction hotline at 630-246-2930.

Customer Impacts

Shoulder closures and traffic shifts will be used to provide room for a work zone and safely accommodate traffic. Whenever possible, the Tollway uses traffic shifts and shoulders to keep as many lanes open during peak hours as were available before construction.

In addition, lane closures will be scheduled as needed on the Tollway and local roads to complete work.

Construction Update (8/22/24)

Traffic shifts and lane closures are in place throughout the Central Tri-State Tollway corridor throughout the season, including:

  • Between St. Charles Road and Butterfield Road, southbound traffic shifts into a split configuration with two left lanes continuing on the I-294 mainline and two right lanes on auxiliary lanes providing access to exit ramps for eastbound I-290 and for westbound I-88 before reconnecting with the southbound I-294 mainline.
  • Between I-55 and Wolf Road, traffic is shifted in both directions with northbound counterflow lanes between Roosevelt Road and Wolf Road. Watch for signage indicating changing traffic patterns.
  • Between 159th Street and I-80, traffic is shifted in both directions with a split configuration on the southbound side. Southbound traffic exiting to I-80 must be in the far-right lane before the split.

Local Roads
On Butterfield Road, traffic is reduced to a single lane in both directions under I-294 between Calvin Avenue and I-290. The closures are scheduled to remain in place through 2024.

Ramps
At the I-290/I-88 Interchange at I-294:

  • The ramp carrying traffic from westbound I-290 to northbound I-294 is closed. A detour is posted. The ramp is scheduled to remain closed through the end of 2024. 

  • The ramp carrying westbound Roosevelt Road to southbound I-294 is closed. A detour is posted. The ramp is scheduled to remain closed through the end of 2024.

  • Additional lane and ramp closures are scheduled throughout the year on I-294 and I-290. Detours will be posted. 

In conjunction with work at the 88th/Cork Avenue Interchange, the ramp connecting eastbound Archer Avenue to southbound I-294 is closed through 2025. A detour is posted

A Regional Solution

The Central Tri-State Tollway is being reconstructed to increase capacity, reduce congestion and improve travel reliability. This work is part of the Tollway’s 15-year, $14 billion capital program, Move Illinois: The Illinois Tollway Driving the Future. More than 220,000 vehicles use this portion of the Tri-State Tollway daily.

A detailed planning and refinement process is underway to complete a design concept for rebuilding the Central Tri-State Tollway (I-294). This process includes outreach efforts with customers, communities, businesses and partners to identify regional improvements and continue to refine the design details.

Visit the Central Tri-State Tollway (I-294) outreach page.

Noisewalls

In accordance with the Tollway’s Noise Study and Abatement Policy, the Tollway is conducting a noise analysis to help assist the Tollway in identifying areas for additional noise solutions. The policy outlines specific measurements and considerations that all factor into proposed noise abatement measures.

Noise Analysis Reports and Maps 
Noisewall Brochure 
Common Noise Levels

Work Zone Safety

The Illinois Tollway is committed to ensuring that the Central Tri-State Tollway (I-294) and local roads remain safe for both drivers and workers during construction, which is part of the agency’s overall commitment to roadway safety.

Work zone speed limits are in effect in all construction zones 24/7 and drivers should continue to watch for changing traffic patterns and use caution, especially when workers are present. 

Visit the Tollway's Work Zone Safety page.

News
4/13/2022 - Grand Avenue Lane Closures and Detours Scheduled Under the Tri-State Tollway (I-294) Near Franklin Park
4/26/2022 - Lane Closure and Detour Scheduled on West Lake Street in Elmhurst and Northlake for Illinois Tollway Improvements
4/27/2022 - Overnight Lane Closures Scheduled Next Week on Wolf Road for Central Tri-State Tollway (I-294) Work
5/4/2022 - Work to Begin Removal of Hinsdale Oasis Over-The-Road Pavilion Begins This Week
5/4/2022 - Overnight and Weekend-Long Closures Scheduled on Roberts Road and 87th Street for Central Tri-State Tollway (I-294) Bridge Reconstruction Work
5/16/2022 - Overnight Ramp Closures and Detours Scheduled at Ogden Avenue Interchange on Central Tri-State Tollway (I-294)
5/17/2022 - Daily Lane Closures Scheduled to Begin This Week on Grand Avenue Under the Tri-State Tollway (I-294) Near Franklin Park
5/26/2022 - Overnight and Weekend-Long Closures Rescheduled on Roberts Road and 87th Street for Central Tri-State Tollway (I-294) Bridge Reconstruction Work-Rescheduled
5/27/2022 - Long-Term Traffic Shifts Begin Next Week on Central Tri-State Tollway (I-294) Southbound Between 83rd Street Toll Plaza and 95th Street
6/2/2022 - Final Beam Deliveries Scheduled for New Southbound Mile Long Bridge on Central Tri-State Tollway (I-294) Project
6/6/2022 - Lane Closure Scheduled Along Southbound Mile Long Bridge on Central Tri-State Tollway (I-294)
6/10/2022 - Overnight Closures Including Extended Ramp Detour Scheduled to Begin on the Tri-State Tollway (I-294) as Part of the I-290/I-88 Interchange Project at I-294
6/14/2022 - Tollway to Reopen Ramps at St Charles Road Interchange on I-290
6/21/2022 - Ramp Lane Closures Scheduled on North Avenue, Lake Street Under the Tri-State Tollway (I-294) in Elmhurst and Northlake
7/5/2022 - Overnight Lane Closure Scheduled on Tri-State Tollway (I-294) for Bridge Beam Removal at the Hinsdale Oasis
7/7/2022 - Grand Avenue Lane Closures and Detours Scheduled Under the Tri-State Tollway (I-294) Near Franklin Park
7/29/2022 - Traffic Shifts and Overnight Ramp Closures Scheduled to Continue in August as Part of the I-290/I-88 Interchange Project at I-294
7/22/20222 - Traffic Shift Scheduled on 88th/Cork Avenue as Part of Interchange Work on the Central Tri-State Tollway (I-294) Project
7/27/2022 - Overnight Lane Closures Rescheduled to August on 47th Street and Central Tri-State Tollway (I-294) for Pedestrian Bridge Placement
8/1/2022 - Traffic Shift Scheduled on Plainfield Road Near Western Springs for Local Road Bridge Reconstruction Over Tri-State Tollway (I-294)
8/11/2022 - Traffic Shift Scheduled on Ogden Avenue for Bridge Work at Central Tri-State Tollway (I-294) Interchange Project
8/12/2022 - Weekend-Long Lane Closures Scheduled on Central Tri-State Tollway (I-294) for Mainline Reconstruction Between Wolf Road and O'Hare Oasis
8/12/2022 - New Long-Term Traffic Shift Next Week on Central Tri-State Tollway (I-294) Between 83rd Street Toll Plaza and Mile Long Bridge
8/18/2022 - Overnight Closures Scheduled on Tri-State Tollway (I-294) and Plainfield Road for Bridge Reconstruction Work
8/18/2022 - Detours Scheduled on Joliet Road Ramp for Bridge Repair Work as Part of the Central Tri-State Tollway (I-294) Project
8/24/2022 - Updated: Overnight Closures Rescheduled on I-55 for Central Tri-State Tollway (I-294) for Mainline Bridge Reconstruction Work
9/8/2022 - Long-Term County Line Road Closure and Detour Begins Next Week for Illinois Tollway Improvements
8/25/2022 - Overnight Closures Rescheduled on Roberts Road and 87th Street for Central Tri-State Tollway (I-294) Bridge Reconstruction Work
9/16/2022 - Nightly Ramp Closure Scheduled at I-55 Interchange on Tri-State Tollway (I-294) for Bridge Reconstruction Work
9/22/2022 - Traffic Shift Scheduled on Ogden Avenue for Bridge Work at Central Tri-State Tollway (I-294) Interchange Project
4/5/2023 - Roberts Road and 87th Street Intersection Reconstruction Scheduled to Begin Under the Central Tri-State Tollway (I-294)
4/6/2023 - Long-Term Lane Closure Scheduled on Roosevelt Road at Central Tri-State Tollway (I-294) in Hillside
4/11/2023 - Overnight Ramp, Lane Closures Scheduled on North Avenue, Lake Street Under the Tri-State Tollway (I-294) in Elmhurst and Northlake
4/25/2023 - Overnight Closures Scheduled to Prepare for Traffic Shifts on Central Tri-State Tollway (I-294)
4/27/2023 - Long-Term Ramp Closure Scheduled at Roosevelt Road Interchange on Tri-State Tollway (I-294) for Bridge Reconstruction
5/1/2023 - Overnight Ramp Closures Scheduled to Continue in May as Part of the I-290/I-88 Interchange Project at I-294
5/3/2023 -Traffic Shift Scheduled on Plainfield Road Near Western Springs for Local Road Bridge Reconstruction Over Tri-State Tollway (I-294)
5/4/2023 - Overnight Closures Scheduled on Butterfield Road in Berkeley and Hillside for Ongoing Tri-State Tollway (I-294) Bridge Work
5/5/2023 - Overnight Closures Scheduled on Roberts Road and 87th Street for Intersection Reconstruction Work
5/11/2023 - New Traffic Pattern Begins Next Week at Ogden Avenue Interchange on the Tri-State Tollway (I-294)
5/15/2023 - Work Begins to Remove Tri-State Tollway Bridge Over Reagan Memorial Tollway (I-88) as Part of the I-290/I-88 Interchange Project at I-294
5/17/2023 - Overnight Closures Scheduled for Mile Long Bridge Removal Work on Central Tri-State Tollway (I-294)
6/12/2023 - Overnight Ramp Closures Scheduled to Continue in June as Part of the I-290/I-88 Interchange Project at I-294
6/13/20223 - Traffic Shift Scheduled on 88th/Cork Avenue as Part of Interchange Work on the Central Tri-State Tollway (I-294)
6/30/2023 - Overnight Ramp Closures Scheduled to Continue in July as Part of the I-290/I-88 Interchange Project at I-294
7/6/2023 - Overnight Ramp and Lane Closures for Traffic Shift Scheduled Next Week on I-55 at Tri-State Tollway (I-294)
7/11/2023 - Final Pavement Work Scheduled to Begin on South Section of the Central Tri-State Tollway (I-294) Project
7/14/2023 - Lane Closures Scheduled Next Week on Roosevelt Road at Central Tri-State Tollway (I-294) in Hillside
8/2/2023 - New Traffic Patterns Scheduled in Both Directions on Central Tri-State Tollway (I-294) with Overnight Ramp and Lane Closures to Shift Traffic
8/10/2023 - Overnight Closures for Bridge Reconstruction Work at 88th/Cork Avenue Scheduled on Central Tri-State Tollway (I-294)
8/10/2023 - Overnight Ramp Closures Scheduled to Continue in August as Part of the I-294/I-88 Interchange Project at I-294
8/11/2023 - Lane Reduction Rescheduled on Ramp from Eastbound Reagan Memorial Tollway (I-88) to Northbound Tri-State Tollway (i-294) and Westbound I-290
8/21/2023 - Lane Reduction Scheduled on Ramp from Northbound Tri-State Tollway (I-294) to Westbound Reagan Memorial Tollway (I-88)
11/9/2021 - Overnight Closures Scheduled on Tri-State Tollway (I-294) and Plainfield Road for Bridge Reconstruction Work
11/12/2021 - Overnight Lane Closures Scheduled Next Week at LaGrange Road on the Tri-State Tollway (I-294)
11/23/2021 - Overnight Closures Scheduled Next Weekend at I-55 and Wolf Road Ramps for Central Tri-State Tollway (I-294) Project
11/24/2021 - Overnight Closures Scheduled on Roberts Road and 87th Street for Central Tri-State Tollway (I-294) Bridge Reconstruction Work
11/29/2021 - Lane Closure and Detour Continue on Lake Street in Elmhurst and Northlake for Illinois Tollway Improvements
12/3/21 - Overnight Closures Scheduled on Tri-State Tollway (I-294) for St. Charles Road Interchange Improvements
12/6/2021 - Bridge Beam Delivery Continues in December for New Southbound Mile Long Bridge on Central Tri-State Tollway (I-294) Project
12/6/2021 - Traffic Shifts Scheduled Through December on Southern Section of the Central Tri-State (I-294) Project
12/14/2021 - Overnight Closures Rescheduled at I-55 and Wolf Road Ramps for Central Tri-State Tollway (I-294) Project
12/27/2021 - Local Road Closures Scheduled to Begin in January in Conjunction with Central Tri-State Tollway (I-294) Project
1/10/2022 - Bridge Beam Delivery Continues in January for New Southbound Mile Long Bridge on Central Tri-State Tollway (I-294) Project
1/27/2022 - Overnight Closures Including Ramp Detours Scheduled in February on I-290 as Part of the I-290/I-88 Interchange Project at I-294
2/1/2022 - Bridge Beam Delivery Continues in February for New Southbound Mile Long Bridge on Central Tri-State Tollway (I-294) Project
2/3/2022 - Overnight Closures Scheduled on Central Tri-State Tollway (I-294) for Burlington Northern Sant Fe (BNSF) Railway Bridge Project
2/4/2022 - Lane Closures Scheduled on I-290 Ramp to Lake Street/North Avenue Near the Tri-State Tollway in Elmhurst and Northlake
2/28/2022 - Overnight I-290 Closures and Ramp Detours Scheduled in March as Part of the I-290/I-88 Interchange Project at I-294
3/1/2022 - Bridge Beam Delivery Continues in March for New Southbound Mile Long Bridge 0n Central Tri-State Tollway (I-294) Project
3/7/2022 - Traffic Shift Scheduled on the Central Tri-State Tollway (I-294) for Mainline Reconstruction Between Wolf Road and St. Charles Road
3/10/2022 - Traffic Shifts Resuming on Central Tri-State Tollway (I-294) for Mainline Reconstruction Between I-55 and 95th Street
3/10/2022 - Overnight Closures Scheduled on Roberts Road and 87th Street for Central Tri-State Tollway (I-294) Bridge Reconstruction Work
3/11/2022 - Long-Term Lane Closures Scheduled on Joliet Road in Indian Head Park for Central Tri-State Tollway (I-294) Project
3/14/2022 - Overnight Ramp Closures Scheduled on I-290 Near the Tri-State Tollway (I-294) in Elmhurst and Northlake
3/25/2022 - Work Begins to Reconfigure Ogden Avenue Interchange as Part of the Central Tri-State Tollway (I-294) Project
3/28/2022 - Long-Term Lane Closures, Traffic Shift Required on 47th Street for Pedestrian Bridge Construction Over Central Tri-State Tollway (I-294)
3/29/2022 - Closures and Detours Scheduled Through End of Year at I-55 and Wolf Road Ramps on Central Tri-State Tollway (I-294)
3/25/2022 - Overnight Closures with Ramp Detours Scheduled on I-290 as Part of the I-290/I-88 Interchange Project at I-294
4/1/2022 - Ramp, Lane Closures Scheduled on North Avenue Under the Tri-State Tollway (I-294) in Elmhurst and Northlake
6/29/2021 - Overnight Closures Scheduled to Begin This Week on I-290 as Part of the I-290/I-88 Interchange Project at I-294
7/12/2021 - Illinois Tollway Begins Work to Rebuild Plainfield Road Bridge Over Central Tri-State Tollwat (I-294) Near Western Springs
7/14/2021 - Overnight Closures Scheduled on Tri-State Tollway (I-294) for St. Charles Road Interchange Improvements
7/16/2021 - Overnight Lane Closures Scheduled Next Week on Joliet Road, in August on Wolf Road for Central Tri-State Tollway (I-294) Work
7/16/2021 - Overnight Closures Scheduled on Roberts Road and 87th Street for Central Tri-State Tollway (I-294) Bridge Reconstruction Work
7/22/2021 - Closures Scheduled on Roberts Road and 87th Street for Central Tri-State Tollway (I-294) Bridge Reconstruction Work
7/26/2021 - Traffic Shift Scheduled on Plainfield Road Near Western Springs for Local Road Bridge Reconstruction over Tri-State Tollway (I-294)
7/28/2021 - Ramp Closures Scheduled at Archer Avenue Interchange for Central Tri-State Tollway (I-294) Project
8/2/2021 - Nightly Ramp Closures with Detours Scheduled to Begin This Week at I-55 Interchange for Central Tri-State Tollway (I-294) Project
8/16/2021 - Wolf Road Closure, Detour Scheduled this Week in Indian Head Park under the Tri-State Tollway (I-294) for Bridge Beam Placement-
8/30/2021 - Nightly Closures Scheduled at I-55 Interchange for Central Tri-State Tollway (I-294) Project
9/10/2021 - Overnight Closures with Ramp Detour Scheduled at I-290 as part of the I-290/I-88 Interchange Project at I-294
9/13/2021 - Lane Closures Scheduled on North Avenue, Lake Street and Local Roads Under the Tri-State Tollway (I-294) in Elmhurst and Northlake
9/13/2021 - Hinsdale Oasis Over-The-Road Pavilion Closing to Make Way for Improvements to Central Tri-State (I-294) Tollway
9/16/2021 - Corrected: New Traffic Shifts, Ramp Closures to Begin at St. Charles Road Interchange as Work Continues on Ramps, Bridges Over Tri-State Tollway (I-294), I-290
10/5/2021 - Long-Term Lane Closures Scheduled to Begin on Lake Street and North Avenue in Elmhurst and Northlake for Illinois Tollway Improvements
10/7/2021 - Grand Avenue Lane Closures and Detours Scheduled Under the Tri-State Tollway (I-294) Near Franklin Park
10/7/2021 - Tri-State Tollway (I-294) and LaGrange Road Overnight Closures Scheduled to Begin This Weekend for Mile Long Bridge Project
10/14/2021 - Overnight Closures Scheduled on Roberts Road and 87th Street for Central Tri-State Tollway (I-294) Bridge Reconstruction Work
10/18/2021 - Long-Term Ramp Closure and Detour to Begin This Week at I-290 for Central Tri-State Tollway (I-294) Project
10/20/2021 - Overnight Closures Scheduled on Butterfield Road for Bridge Work on Tri-State Tollway (I-294)
10/26/2021 - Overnight Ramp Detour Scheduled This Weekend at I-290 on Northbound Tri-State Tollway (I-294) and Eastbound Reagan Memorial Tollway (I-88)
10/5/2022 - Overnight Closures Scheduled on Central Tri-State Tollway (I-294) for I-55 Ramp Bridge Work
10/5/2022 - New Southbound Mile Long Bridge Scheduled to Open to Traffic Next Week on the Tri-State Tollway (i-294)
10/7/2022 - Overnight Ramp Closures Scheduled to Continue in October as Part of the I-290/I-88 Interchange Project at I-294
10/11/2022 - Lane Closures for Pedestrian Bridge Placement Scheduled This Week on 47th Street, Central Tri-State Tollway (I-294)
10/19/2022 - Weekend Ramp and Lane Closures Scheduled on Tri-State Tollway (I-294) For New Long-Term Traffic Shift Between Roberts Road and 95th Street
10/19/2022 - Long-Term Closure and Detour Scheduled at Ogden Avenue Interchange on Central Tri-State Tollway (I-294)
11/2/2022 - Overnight Closures Scheduled on Tri-State Tollway (I-294) and Plainfield Road for Bridge Reconstruction Work
11/9/2022 - Weekend-Long Lane and Ramp Closure Scheduled at 95th Street Interchange on Tri-State Tollway (I-294)
11/10/2022 - Tri-State Tollway (I-294) Paving Work to Begin This Weekend Between Mannheim Road and Grand Avenue
11/28/2022 - Ramp Closures Scheduled to Continue in December as Part of the I-290/I-88 Interchange Project at I-294
12/8/2022 - Weekend Lane Closures Scheduled on Northbound Tri-State Tollway (I-294) Over I-55 for Bridge Construction
12/13/2022 - New Pedestrian Bridge Opens Over Central Tri-State Tollway (I-294) for Hinsdale and Western Springs
12/13/2022 - Long-Term Traffic Shifts Begin This Week on the Central Tri-State Tollway (I-294) Between North Avenue and Wolf Road
12/14/2022 - Ramp Reopening, Traffic Shift Scheduled at Ogden Avenue Interchange on Central Tri-State Tollway (I-294)
12/15/2022 Winter Work to Continue on Central Tri-State Tollway (I-294) Project South Segment Between 95th Street And I-55
1/9/2023 - Overnight Ramp Closures and Detours Scheduled at Ogden Avenue Interchange on Central Tri-State Tollway (I-294)
1/11/2023 - Ramp, Lane Closures Scheduled on North Avenue and Lake Street Under Tri-State Tollway (I-294) in Elmhurst and Northlake
1/12/2023 - Grand Avenue Lane Closures and Detours Scheduled Under the Tri-State Tollway (I-294) Near Franklin Park-
1/20/2023 - Ongoing Overnight Ramp Closures Scheduled on I-290 as Part of the I-290/I-88 Interchange Project at I-294
2/2/2023 - Overnight Closures with Ramp Detours Scheduled to Prepare for Traffic Shift on Central Tri-State Tollway (I-294)
2/3/2023 - Traffic Shift Scheduled Next Week on Northbound Tri-State Tollway (I-294) Including Reopening Ramps to Southbound I-55 and Wolf Road
2/8/2023 - Reopening Ramp to Southbound I-55 and Wolf Road Rescheduled on Northbound Tri-State Tollway (i-294)
2/10/2023 - Nightly Lane Closures Scheduled to Begin for Pedestrian Bridge Over Tri-State Tollway (I-294)
2/16/2023 - Overnight Closures Scheduled on Roberts Road and 87th Street for Central Tri-State Tollway (I-294) Bridge Reconstruction Work
2/17/2023 - Long-Term Lane Closures Scheduled on Butterfield Road in Berkeley and Hillside for Tollway Construction
2/28/2023 - Overnight Closures Scheduled on Central Tri-State Tollway (I-294) for Bridge Reconstruction Work at 88th/Cork Avenue
2/28/2023 - Traffic Shift and Long-Term Ramp Detour Scheduled as Part of the I-290/I-88 Interchange Project at I-294
3/22/2023 - Grand Avenue Lane Closures and Detours Scheduled Under the Tri-State Tollway (I-294) Near Franklin Park
3/27/2023 - Overnight Closures Scheduled on Roberts Road and 87th Street for Central Tri-State Tollway (I-294) Bridge Reconstruction Work
2/10/2021 - Long-Term Lane Closures Scheduled on Joliet Road in Indian Head Park for Central Tri-State Tollway (I-294) Project
2/18/2021 - Work Scheduled This Week on the Central Tri-State Tollway (I-294) to Begin Mainline Reconstruction Between Wolf Road and St. Charles Road
2/24/2021 - Overnight Ramp and Lane Closures, Traffic Shifts Scheduled in February, March on Tri-State Tollway (I-294) and I-290 for ComEd Work
3/3/2021 - Long-Term Traffic Shifts Scheduled to Begin This Week on Central Tri-State Tollway (I-294) for 2021 Roadway Work
3/8/2020 - Overnight Closures Scheduled on Archer Avenue, LaGrange Road and the Central Tri-State Tollway (I-294) for Ongoing Bridge Work
3/12/2021 - Work Beginning on Central Tri-State Tollway (I-294) Project Mainline Reconstruction Between I-55 and 95th Street
3/16/2021 - Reconstruction Work Begins at I-290/St. Charles Road Interchange for Central Tri-State Tollway (I-294) Project
3/18/2021 - Ramp Closures Scheduled at Archer Avenue Interchange for Central Tri-State Tollway (I-294) Project
3/24/2021 - Closures, Detour Scheduled on Joliet Road and Ramps Connecting Central Tri-State Tollway (I-294) and I-55
4/9/2021 - Long-Term Traffic Shifts and Lane Reductions Begin Next Week Between Plainfield Road and 75th Street on Central Tri-State Tollway (I-294)
4/14/2021 - Northbound Counterflow Begins on Central Tri-State Tollway (I-294) Between 95th Street and the 83rd Street Toll Plaza
4/23/2021 - Overnight Closures Scheduled on Roberts Road and 87th Street for Central Tri-State Tollway (I-294) Bridge Reconstruction Work
4/28/2021 - Ramp Closures Scheduled This Week at I-55 Interchange for Central Tri-State Tollway (I-294) Project
5/19/2021 - Grand Avenue Detour and Overnight Lane Closures Scheduled in May on Local Roads Under the Tri-State Tollway (I-294) in Elmhurst and Northlake
5/24/2021 - Detour of Eastbound Lake Street and Overnight Closures Scheduled in May on Local Roads Under the Tri-State Tollway (I-294) in Elmhurst and Northlake
5/28/2021 - Detours Scheduled Through Mid-June on 79th Street Ramp, Archer Avenue for Ongoing Bridge Work on the Central Tri-State Tollway (I-294) Project
06/18/2018 - Closures Scheduled to Begin This Week for Advance Work on the Central Tri-State Tollway (I-294) Project
07/05/2018 - Construction Scheduled to Begin Next Week on Local Bridges Over the Central Tri-State Tollway (I-294)
07/05/2018 - Ramps Connecting Irving Park Road to Northbound Tri-State Tollway (I-294) Scheduled to Close Next Week for Roadway Construction
08/24/2018 - O'Hare Oasis Over-The-Road Pavilion Closing to Make Way for Improvements to Central Tri-State (I-294) Tollway
09/24/2018 – New Traffic Pattern Scheduled to Begin This Week for Central Tri-State Tollway (I-294) Reconstruction
09/27/2018 - Local Lane Closures Scheduled in Schiller Park for Central Tri-State Tollway (I-294) Reconstruction Project
8/24/2023 - Ramp, Lane Closures Scheduled on North Avenue and Lake Street Under Tri-State Tollway (I-294) in Elmhurst and Northlake
8/25/2023 - Long-Term Ramp Closure and Detour Scheduled at Ogden Avenue Interchange on Central Tri-State Tollway (I-294)
8/29/2023 - Overnight Ramp Closures at Archer Avenue for the Central Tri-State Tollway (I-294) Project
2/25/2020 - Overnight Ramp Closures Scheduled to Begin This Week for Utility Relocation Along the Central Tri-State (I-294) Tollway
3/16/2020 - Closures Scheduled to Begin This Week for Continuing Work on the Central Tri-State Tollway (I-294) Project
3/27/2020 - Overnight Ramp Closures Scheduled in April for Utility Relocation Along the Central Tri-State (I-294) Tollway
4/27/2020 - Work Scheduled to Begin This Week for Sewer Relocation Work for the Central Tri-State Tollway (I-294) Project
5/18/2020 - Illinois Tollway Begins Advance Work to Prepare for Central Tri-State Tollway (I-294) Rebuilding and Widening Between I-55 and 95th Street
6/9/2020 - Central Tri-State Tollway (I-294) Lane Reductions Scheduled to Begin This Weekend
6/11/2020 - Updated--Central Tri-State Tollway (I-294) Lane Reductions Scheduled to Begin This Weekend
6/16/2020 - Closures Scheduled at the Balmoral Avenue Interchange on the Tri-State Tollway (I-294)
6/24/2020 - Extended Ramp Closure Scheduled to Begin Next Week at the Archer Avenue Interchange on the Tri-State Tollway (I-294)
7/10/2020 - Overnight Closures Scheduled on Tri-State Tollway (I-294) and Ramp From LaGrange Road
7/23/2020 - Overnight Ramp and Lane Closure Scheduled This Weekend on I-290 at the Tri-State Tollway (I-294)
10/16/2018 – Illinois Tollway, Illinois Department of Transportation and Cook County Announce Commitment to Build $30 Million Interchange in Justice
11/09/2018 – Temporary, Overnight Ramp Closures Scheduled Next Week at I-190 on the Tri-State Tollway (I-294)
11/19/2018 - Central Tri-State Tollway (I-294) Project Between Rosemont and Franklin Park Nearing Winter Configuration
01/14/2019 - Work to Begin Removal of O'Hare Oasis Over-The-Road Pavilion Begins This Week
9/18/2020 - Overnight Ramp and Lane Closures Scheduled in September on Tri-State Tollway (I-294) at I-290 for ComEd Work
10/14/2020 - Overnight Ramp and Lane Closures, Traffic Shifts Scheduled in October on Tri-State Tollway (I-294) at I-290 for ComEd Work
10/21/2020 - Long-Term Lane Closure Scheduled on Butterfield Road in Berkley and Hillside for I-290/I-88 Interchange Project at I-294
11/30/2020 - Overnight Ramp and Lane Closures, Traffic Shifts Scheduled in December on Tri-State Tollway (I-294) at I-290 for ComEd Work
12/7/2020 - Ramp Closure Scheduled this Weekend at LaGrange Road on the Tri-State Tollway (I-294)
8/6/2020 - Overnight Ramp and Lane Closure Rescheduled for This Weekend on St. Charles Road and I-290 at the Tri-State Tollway (I-294)
8/28/2020 - Weekend Overnight Ramp and Lane Closures Scheduled on St. Charles and I-290 at the Tri-State Tollway (I-294)
04/23/2018 - Illinois Tollway Public Open House Meetings Planned for Central Tri-State Tollway (I-294) Project
02/13/2019 – Illinois Tollway to Host Construction Event for Firms Interested in Bidding on the Mile Long Bridge Project
03/14/2019 - Overnight Lane Closures Scheduled on Tri-State Tollway (I-294) for Bridge Beam Removal at the O'Hare Oasis
03/22/2019 - Overnight Lane Closures Scheduled to Begin in March for Central Tri-State Tollway (I-294) Signage Work
04/16/2019 - Updated--Temporary, Overnight Ramp Closures Rescheduled at I-190 on the Tri-State Tollway (I-294)
05/07/2019 - Traffic to Shift on Ramps Connecting Irving Park Road to Tri-State Tollway (I-294) Scheduled for Roadway Construction
05/13/2019 – Illinois Tollway Public Open House Meetings Planned for Central Tri-State Tollway (I-294) Project
05/20/2019 - Lane Closures Scheduled to Begin This Week for Central Tri-State Tollway (I-294) Bridge Repairs
09/03/2019 – Construction Scheduled to Begin on Burlington Northern Santa Fe (BNSF) Railway Bridge Project on Central Tri-State Tollway (I-294)
09/12/2019 – Overnight Lane Closures Scheduled This Week on Irving Park Road for Central Tri-State Tollway (I-294) Work in Schiller Park
09/20/2019 - Closures Scheduled at the Balmoral Avenue Interchange on the Tri-State Tollway (I-294)
10/25/2019 - Overnight Lane Closures Scheduled Next Week on LaGrange Road for Central Tri-State Tollway (I-294) Work in Willow Springs and Justice
11/13/2019 - Ramp Closures Scheduled to Begin Next Week at I-290 Interchange at the Tri-State Tollway (I-294) and Reagan Memorial Tollway (I-88)
Showing 1 to 5 of 25 results